Is crossrail.co.uk down or not working?

What happened to crossrail.co.uk, why did the website go down and not work? Here you can see who else is having the same problem with crossrail.co.uk, as well as possible solutions. According to our statistics, the following most often do not work: Website, Login, Account, Mobile App.

Current status: No failures

At the moment, according to our data, crossrail.co.uk is working fine, but single failures are possible. If crossrail.co.uk does not work for you, then report your problem and write a comment.

What to do if the site crossrail.co.uk is not available? Try our guide.

crossrail.co.uk outage reports in the last 24 hours

crossrail.co.uk - error and failure reports, troubleshooting methods

Leave your comment describing the failure and share with other users how to solve the problem.
  • No registration required.
  • Messages with obscene language and insults, as well as breaking the law, are not allowed to be published.
  • Active links in the text of the message are not published, but displayed in plain text.
  • It is forbidden to post your own and other people's personal data: addresses, phone numbers, emails, accounts in instant messengers, etc.

Technical information

Main page title:
Crossrail - CrossrailTwitterLinkedInYouTubeFacebookInstagramFlickr
Main page description:
Crossrail Ltd has delivered the Elizabeth line - a new railway for London and the South East, running from Reading and Heathrow in the west, through 42km of new tunnels under London to Shenfield and Abbey Wood in the east. The Elizabeth line has 41 accessible stations including 10 major new stations from Paddington to Abbey Wood.
Protocol:
https
Status code:
200
Page size:
145.9 KB
Response time:
1.757sec.
IP:
172.67.70.223
Response headers:
server: nginx
date: Tue, 01 Oct 2024 16:08:19 GMT
content-type: text/html; charset=UTF-8
content-length: 149389
connection: close
x-archive-orig-date: Thu, 29 Dec 2022 00:50:42 GMT
x-archive-orig-transfer-encoding: chunked
x-archive-orig-connection: keep-alive
x-archive-orig-strict-transport-security: max-age=2592000; preload
x-archive-orig-x-frame-options: sameorigin
x-archive-orig-x-content-type-options: nosniff
x-archive-orig-referrer-policy: no-referrer-when-downgrade
x-archive-orig-set-cookie: S24SESSID=ku0p3vj6crrqjboloi9l87filj; path=/; domain=www.crossrail.co.uk; HttpOnly
x-archive-orig-cache-control: max-age=172800
x-archive-orig-permissions-policy: accelerometer=(), camera=(), geolocation=(), gyroscope=(), magnetometer=(), microphone=(), payment=(), usb=(), interest-cohort=()
x-archive-orig-x-ua-compatible: IE=edge
x-archive-orig-age: 1594
x-archive-orig-grace: none
x-archive-orig-x-served-by: cloud4
x-archive-orig-expires: Sat, 31 Dec 2022 00:50:42 GMT
x-archive-orig-cf-cache-status: DYNAMIC
x-archive-orig-report-to: {"endpoints":[{"url":"https:\/\/a.nel.cloudflare.com\/report\/v3?s=ujX3BbpW%2BB0fi3DWZmvNk6k1%2FfxQsJ2SGUcvUOtwC3i2OC9l1X%2FKMDaNOwX%2Bp%2Fz%2BR2iYvRlHhwufXPimG1GiTH1k1aOsafGiRda9vzLb5TUpV7bAt0OltqOB8RvfL6qn4qZRaEA%3D"}],"group":"cf-nel","max_age":604800}
x-archive-orig-nel: {"success_fraction":0,"report_to":"cf-nel","max_age":604800}
x-archive-orig-vary: Accept-Encoding
x-archive-orig-server: cloudflare
x-archive-orig-cf-ray: 780e8b07e97d984c-SJC
x-archive-guessed-content-type: text/html
x-archive-guessed-charset: utf-8
x-archive-orig-content-encoding: gzip
memento-datetime: Thu, 29 Dec 2022 00:50:42 GMT
link: <https://www.crossrail.co.uk/>; rel="original", <https://web.archive.org/web/timemap/link/https://www.crossrail.co.uk/>; rel="timemap"; type="application/link-format", <https://web.archive.org/web/https://www.crossrail.co.uk/>; rel="timegate", <https://web.archive.org/web/20020205081215/http://www.crossrail.co.uk:80/>; rel="first memento"; datetime="Tue, 05 Feb 2002 08:12:15 GMT", <https://web.archive.org/web/20221228221731/https://www.crossrail.co.uk/>; rel="prev memento"; datetime="Wed, 28 Dec 2022 22:17:31 GMT", <https://web.archive.org/web/20221229005042/https://www.crossrail.co.uk/>; rel="memento"; datetime="Thu, 29 Dec 2022 00:50:42 GMT", <https://web.archive.org/web/20221229030316/http://www.crossrail.co.uk/>; rel="next memento"; datetime="Thu, 29 Dec 2022 03:03:16 GMT", <https://web.archive.org/web/20241001033114/http://www.crossrail.co.uk/>; rel="last memento"; datetime="Tue, 01 Oct 2024 03:31:14 GMT"
content-security-policy: default-src 'self' 'unsafe-eval' 'unsafe-inline' data: blob: archive.org web.archive.org web-static.archive.org wayback-api.archive.org athena.archive.org analytics.archive.org pragma.archivelab.org
x-archive-src: spn2-20221229005418/spn2-20221229000258-wwwb-spn14.us.archive.org-8005.warc.gz
server-timing: captures_list;dur=0.573362, exclusion.robots;dur=0.028130, exclusion.robots.policy;dur=0.016249, esindex;dur=0.013247, cdx.remote;dur=44.048974, LoadShardBlock;dur=68.135007, PetaboxLoader3.datanode;dur=83.716382, load_resource;dur=117.266045, PetaboxLoader3.resolve;dur=87.378378, TR;dur=0,Tw;dur=0,Tc;dur=1, MISS
x-app-server: wwwb-app210
x-ts: 200
x-tr: 604
x-location: All
x-rl: 0
x-na: 0
x-page-cache: MISS
x-nid: -
referrer-policy: no-referrer-when-downgrade
permissions-policy: interest-cohort=()

SEO headers

h2 Cookies on the Crossrail website
h1 Crossrail
h2 Direct services into the central section of the Elizabeth line
h2 Plan your Elizabeth line journeys now
h2 Learnings from one of the largest infrastructure projects in Europe
h2 Delivering the Elizabeth line
h2 Tens of thousands of items uncovered spanning 55 million years
h2 Elizabeth line images
h2 Integrating art and architecture
h2 How was the Elizabeth line built?
h1 Latest news
h3 Businesses celebrate impact of Elizabeth line as railway marks six months in service
h3 Direct Elizabeth line services into central London from Reading, Heathrow, and Shenfield start today
h3 Bond Street Elizabeth line station brings a modern classical design and thought-provoking artwork
h3 Bond Street’s new Elizabeth line station now open
h3 Bond Street’s new Elizabeth line station to open next week
h3 Crossrail Project Update
h3 Bond Street Elizabeth line station to open on 24 October
h3 Ilford station goes step-free as new entrance building opens for Elizabeth line passengers
h3 Passengers benefit from completion of Romford station upgrades
h5 Moving London Forward

How to solve problems with crossrail.co.uk

Errors on the crossrail.co.uk website can be either on the server side or on your side (client side). If there is practically nothing to be done about errors on the server side (it remains only to wait for the site to work again), then with errors on the client side it is possible to solve the problem with the availability of crossrail.co.uk on your own.