Is themetrorailguy.com down or not working?

What happened to themetrorailguy.com, why did the website go down and not work? Here you can see who else is having the same problem with themetrorailguy.com, as well as possible solutions. According to our statistics, the following most often do not work: Website, Login, Account, Mobile App.

Current status: No failures

At the moment, according to our data, themetrorailguy.com is working fine, but single failures are possible. If themetrorailguy.com does not work for you, then report your problem and write a comment.

What to do if the site themetrorailguy.com is not available? Try our guide.

themetrorailguy.com outage reports in the last 24 hours

themetrorailguy.com - error and failure reports, troubleshooting methods

Leave your comment describing the failure and share with other users how to solve the problem.
  • No registration required.
  • Messages with obscene language and insults, as well as breaking the law, are not allowed to be published.
  • Active links in the text of the message are not published, but displayed in plain text.
  • It is forbidden to post your own and other people's personal data: addresses, phone numbers, emails, accounts in instant messengers, etc.

Technical information

Main page title:
The Metro Rail Guy
Main page description:
Chronicling the progress of India's Metro systems with daily curated updates from Delhi, Mumbai, Bangalore, Chennai, Kolkata, Hyderabad and others!
Main page keywords:
india,metro,rail,construction,updates
Protocol:
https
Status code:
200
Page size:
142.4 KB
Response time:
3.094sec.
IP:
188.114.97.0
Response headers:
date: Tue, 01 Oct 2024 23:51:39 GMT
content-type: text/html; charset=UTF-8
transfer-encoding: chunked
connection: close
link: <https://themetrorailguy.com/wp-json/>; rel="https://api.w.org/"
cf-cache-status: DYNAMIC
report-to: {"endpoints":[{"url":"https:\/\/a.nel.cloudflare.com\/report\/v4?s=K95jGHfRs4J8dtJuYneHjWeshnY8uxoaoEU7rVqTWSy9TIzFQw%2Bvn6Jy%2FFiDwykAQ%2FtNGcNQRYjpVG7KodNfa5a41KU7J2RHuWCdQ6AjHP%2FmhlqdkKJ0Qo5vNEwQLVZmUP%2BA8fH4"}],"group":"cf-nel","max_age":604800}
nel: {"success_fraction":0,"report_to":"cf-nel","max_age":604800}
speculation-rules: "/cdn-cgi/speculation"
server: cloudflare
cf-ray: 8cc05c9cff49669e-AMS

SEO headers

h1
h1 KEC & BNC Win Nagpur Metro Phase 2’s Two Electrification Contracts
h1 11 Bidders for Lucknow Metro Line-2’s Geotechnical Contract
h1 Welspun Wins Dharavi – Ghatkopar Water Tunnel’s Contract in Mumbai
h1 KEC & BNC Win Nagpur Metro Phase 2’s Two Electrification Contracts
h1 11 Bidders for Lucknow Metro Line-2’s Geotechnical Contract
h1 Welspun Wins Dharavi – Ghatkopar Water Tunnel’s Contract in Mumbai
h1 Pune Metro’s Swargate – District Court Section Inaugurated to Complete Phase 1
h1 CMRS to Inspect Bangalore Metro’s Madavara Extension on October 3-4
h1 RITES-led JV Wins Delhi Metro RS-1’s Train Upgrade Contract
h1 Surat Metro’s TBM Tapi Records Final Breakthrough at Railway Station
h1 Bids Invited for Delhi Airport’s APM Train Line Connecting T3 – T1
h1 3 Bidders for Dharavi – Ghatkopar Water Tunnel’s Contract in Mumbai
h1 Mumbai Metro Line-4’s Track Work Begins at Majiwada
h1 GR Infraprojects Wins Nagpur Metro Phase 2 Package C-02’s Contract
h1 Delhi Metro Phase 4’s 1st Alstom RS17 Train Rolls Out in Sri City
h1 L&T & Siemens Bid for Nagpur Metro Phase 2’s Telecom Contract TL-01
h1 Chennai Metro Phase 2’s 1st Alstom Train Rolls Out in Sri City
h3 Buy me a beer :)
h3 Become a Member
h3 Receive Instant Email Notifications
h3 Quick Snapshot
h3 Categories

How to solve problems with themetrorailguy.com

Errors on the themetrorailguy.com website can be either on the server side or on your side (client side). If there is practically nothing to be done about errors on the server side (it remains only to wait for the site to work again), then with errors on the client side it is possible to solve the problem with the availability of themetrorailguy.com on your own.